If you live in Gunter or are looking at a home here, don’t put a future tollway on your commute map. Check today’s drive first, then follow the projects below separately.
Dallas North Tollway: main lanes vs. frontage roads
NTTA’s Phase 4 project page separates the work north of US 380 into phases. Phase 4A runs to FM 428 in Celina. NTTA is targeting late 2027 for Phase 4A and has not announced an opening date for Phase 4B, from FM 428 to the Grayson County line. NTTA lists the Phase 4B frontage roads separately from the main lanes. A frontage-road opening does not mean the full tollway is open to Gunter. Use NTTA’s project page for the latest status and map.
Grayson County: an existing spur and a proposed tollway
TxDOT’s Grayson County Tollway study describes a longer north-south corridor. TxDOT’s Paris District project list says FM Spur 121 (Grayson Parkway), between CR 60 and FM 121 west of Gunter, was completed in August 2023. That road is separate from the proposed county tollway.
East-west travel: start with FM 121
FM 121 is Gunter’s existing east-west route. TxDOT’s proposed Gunter Relief Route would connect the FM 121 corridor near Scharff Road west of town to SH 289 south of town. That is different from the Collin County Outer Loop, a separate corridor south of Gunter. For future coverage, the questions worth asking are which connections would divert through traffic, where local access would remain, and what each option would mean for properties and school routes.
Buying or commuting? Try the drive at the hours you actually travel, using roads open now. Start with our moving guide for other address-specific checks.
Project sources checked November 25, 2026. Alignments and schedules can change.